Ditemukan 20173 dokumen yang sesuai dengan query :: Simpan CSV
Tesis ini membahas dan bertujuan menyusun Renstra sistem Diklit di RSP Otak Nasional Jakarta 2014 ? 2018 untuk mencapai Visi menjadi RS Neurologi berkualitas Internasional dan diakui secara Global. Metode penelitian adalah Kualitatif Riset Operasional dengan pendekatan analisis TOWS dan Consensus Decision Making Grup.
Penelitian ini menyimpulkan RSP Otak Nasional dalam posisi Growth dengan strategi terpilih adalah Product Development dalam bentuk RS Pendidikan dan Penelitian terakreditasi disertai unit Institut Neuro Sains Indonesia (INSI). Penelitian menyarankan kerjasama Kemenkes dan Kemendikbud dalam mengembangkan produk Diklit untuk menunjang pelayanan dan pemerataan kesehatan Neurologi.
The purpose of this study is to develop Strategic Planning of Education & Research System in RSP Otak Nasional Jakarta period 2014 ? 2018 in achieving the Vision as the International Accredited Hospital. This Qualitative Operational Research using TOWS analysis and Consensus Decision Making Group.
This research conclude that RSP Otak Nasional is in growth position with a chosen strategy, that is Product Development as Education & Research Hospital include Indonesian Neuro Science Institute (INSI) unit. The researcher suggest that the Ministry of Health must coordinate with Ministry of Education and Cultural in developing education & research product to support the Neurology health service.
Rumah sakit sebagai salah satu fasilitas pelayanan kesehatan memiliki peran yang sangat strategis dalam upaya mempercepat peningkatan derajat kesehatan masyarakat Indonesia, karena rumah sakit merupakan fasilitas kesehatan yang padat pakar dan teknologi. Rumah Sakit Tugu Ibu sebagai salah satu unit pelayanan kesehatan di Kota Depok, telah mendapatkan pengakuan dari pemerintah dalam memenuhi standar pelayanan dengan adanya status ?Akreditasi Penuh Tingkat Dasar?. Pada saat ini jumlah tenaga Rumah Sakit Tugu Ibu sebanyak 411 orang tenaga medis 68 Orang,tenaga Perawat & bidan 161 Orang, tenaga non perawat 29 Orang, dan Tenaga penunjang & prakarya 59 Orang dan tenaga non medis sebanyak 120 orang.
Kata Kunci: Lean Thinking, BPJS, klaim, value added activity, non value addedactivity, waste
Delay in the submission of BPJS claims resulted in decreasing hospital cash flow. The currentclaim process is not efficient and effective.The objective of this reseach is to analize and proposeimprovement in the claim process by applying Lean Hospital concept. This research usedquantitative and qualitative approaches to observed the time required to complete the claimprocess before submitted to the BPJS verificator and also have an in-depth interview, observe theprocess, and document review. The result showed most waste happened in mobilisasi dana unitfor 32.5 days 18.8 minutes in the settlement BPJS document claims. Based on Value StreamMapping, Lead Time of the claim process at this time is 33.9 day. Most types of waste arewaiting and transportation. Proposed improvement provided from the study is to optimizing thecasemix team which newly formed. By optimizing the casemix team, Lead Time required tocomplete the claims process is 6.44 minutes. Standardize work and performance appraisal (KPI,IKI, and IKU) consider to apply to reach employee best performance.
Keywords: Lean Thinking, BPJS, claim, value added activity, non value added activity, waste
The green hospital concept is a change management that is a necessity in hospitals that can significantly reduce energy consumption, increase comfort and productivity and preserve sustainable natural resources. In providing health services, hospitals use a number of energy, including electricity, water, fuel, patients food and building materials. In addition, hospitals also produce medical and non-medical waste. This can be a contribution to climate change if it is not managed properly. This study assesses the readiness of Prof. Dr. dr. Mahar Mardjono National Brain Center Hospital Jakarta which refers to the national standard of Greenship Green Building Council Indonesia (GBCI). This research is a case study using a qualitative research method approach by making observations to observe and examine various objects in the study, take measurements and fill out checklists on the instruments/tools. From the research results, it is known that the new RSPON can meet the total value of 58 or 49,54% of the maximum 117 values of the total criteria required in Greenship. Based on the acquisition of these values, in accordance with the GBCI Greenship rating, the RSPON building received a Silver rating. To improve the ranking, it can still be done by providing bicycle parking, increasing the area of green open space (RTH), recommissioning, installing energy monitoring systems, recycling organic waste, recycling treated water from WWTPs, conserving clean water, trying to use solar panel technology. and integrating energy efficiency into maintenance programs
