Hasil Pencarian :: Kembali

Ditemukan 16568 dokumen yang sesuai dengan query ::  Simpan CSV
cover
Hasan, Verdalena / Pembimbing: Prastuti C. Soewondo
S-2597
Depok : FKM UI, 2002
S1 - Skripsi   Pusat Informasi Kesehatan Masyarakat
cover
Handayani, Dyah Tut Wuri; Pembimbing: Sabarinah BP.
T-1022
Depok : FKM-UI, 2001
S2 - Tesis   Pusat Informasi Kesehatan Masyarakat
cover
Syafrawati; Pembimbing: Prastuti Soewondo
S-2865
Depok : FKM-UI, 2002
S1 - Skripsi   Pusat Informasi Kesehatan Masyarakat
cover
Saul Elias Arikalang; Pembimbing: Hafizurrachman
T-505
Depok : FKM UI, 1997
S2 - Tesis   Pusat Informasi Kesehatan Masyarakat
cover
Mirwansyah; Pembimbing: Adang Bachtiar Kantaatmadja, Dumilah Ayuningtyas; Penguji: Mieke Savitri, Asep Zaenal Mustofa, Rina Fitri Ani Bahar
Abstrak:

Peraturan Pemerintah nomar 58 tahun 2005 tetang Pengelolaan Keuangan Daerah menetapkan Satuan Kerja Perangkat Daerah mempunyai kewajiban membuat suatu menyusun suatu rencana kerja yang terukur pendanaannya untuk menjamin keterkaitan dan konsistensi antara perencanaan, penganggaran, pelaksanaan dan pengawasan. Dinas Kesehatan Kabupaten Ogan Komering Ulu melakukan upaya perencanaan yang baik namun belum pernah melakukan evaluasi. Tujuan penelitian ini adalah untuk mengetahui pelaksanaan proses penyusunan perencanaan dan masalah yang dihadapi dalam penyusunan proses perencanaan tahunan di Kabupaten Ogan Komering Ulu tahun 2005, dengan pendekatan sistem yang terdiri dari komponen masukan ( Kewenangan wajib Standar pelayanan Minimal, SIMPUS, Data surveilans, data program, tenaga, dana, fasilitas dan metode), komponen proses (analisis situasi, penetapan tujuan, identiikasi kegiatan, rencana kegiatan operasional ) dan komponen keluaran ( Dokumen perencanaan yang lengkap, cukup dan efisien). Penelitian ini dilakukan dengan menggunakan pendekatan kualitatif dengan teknik pengumpulan data wawancara mendalam dan telaah dokumen, pengumpulan data langsung dengan informan sebanyak 27 orang yang merupakan personil yang bertanggung jawab Iangsung dalam proses penyusunan perencanaan dan dilaksanakan pada bulan Maret dan April 2006. Dari hasil penelitian didapatkan bahwa proses langkah-langkah dalam perencanaan belum dilakukan seperti analisis situasi, penetapan tujuan, identitikasi kegiatan dan rencana kegiatan operasional disebabkan karena kurang memanfaatkan Kwspm, data Simpus tidak dimanfaatkan, data surveilans tidak digunakan, tenaga yang kurang trampil, minimnya pendanaan, dan juga fasilitas yang sangat minim, penyebabnya adalah kurangnya pengetahuan petugas perencana yang masih menyusun perencanaan berdasarkan pengalaman semata dan kurangnya koordinasi dalam mengelola data yang ada. Dari hasil penelitian ini diharapkan ditahun mendatang agar Dinas Kesehatan Kabupaten Ogan Komering Ulu dapat memanfaatkan data dengan baik dengan menganalisis terlebih dahulu, kemudian menggunakan tahap-tahapan perencanaan agar dapat diketahui masalah, tujuan yang diharapkan serta pembiayaan yang diinginkan.

Read More
T-2447
Depok : FKM-UI, 2006
S2 - Tesis   Pusat Informasi Kesehatan Masyarakat
cover
Veni Mirtasari; Pembimbing: Adang Bachtiar
S-3475
Depok : FKM-UI, 2003
S1 - Skripsi   Pusat Informasi Kesehatan Masyarakat
cover
Ika Novidas Jayanti; Pembimbing: Budi Hidayat; Penguji: Bayu Tedja, Pujiyanto, Anwar Hassan
Abstrak:

Dinas Kesehatan Provinsi Sulawesi Tengah memiliki berbagai masalah dart keterbatasan antara. lain menyangkut SDM perencana, S1K, dan dana. Belum adanya dana yang khusus dialokasikan untuk membiayai proses perencanaan dan penganggaran merupakan salah satu masalah yang penting diperhatikan. oleh sebab itu, penelitian ini bertujuan melakukan analisis biaya menggunakan konsep Activity Based Costing (ABC) terhadap proses perencanaan dan penganggaran program kesehatan tahunan Dimas Kesehatan Provinsi Sulawesi Tengah serta menganalisis berbagai faktor yang mempengaruhinya dan hambatan masalah yang dihadapinya. Penelitian ini adalah penelitian studi kasus, dengan pendekatan deskriptif menggunakan metode kualitatif. Melalui vvawancara. mendalam, Focus Group Discussion (FGD), telaah dokurnen danobservasi langsung. Seluruh tahapan aktivitas pereneanaan, mulai dari analisis situasi, identifikasi masalah, penetapan prioritas masalah, penetapan tujuan„ penentuan altematif pemeeahan masalah, penyusunan Reneana Operasional Proyek/Program (ROP), pengerjaan RICA—KL dan RKA—SKPD, asistensi, Koreksi dan revisi serta finalisa.si dokumen perencanaan dan penganggaran sarnpai penyu.sunan draft DIPA dan DPA Dinas Kesehatan Tahun 2007. walaupun implementasinya, tidak selalu dilakukan seeara berumtan atau terpisah tahap demi tahapnya. Beberapa aspek yang mempengaruhi perencanaan dan penganggaran adalah ketersediaan, kecukupan dan kesesu.aian serta kelengkapan berbagai sumber daya, seperti SDM perencana, saran; waktu, dana, jadwal, juklak, Kebijakan OTDA yang mendukung, Sistem Informasi Kesehatan (SIK) dan standar harga satuan barangijasa. Kegiatan perencanaan dan penganggaran selanria ini, merupakan bagian dari Prograrn Kebijakan dan Manajemen Pembangunan Kesehatan (PICMPK). Alokasi dana tahun anggaran 2007 sebesar Rp. 6.706.789.494,- terdiri dari Rp. 5.166.347.000,- APBN dan Rp. 1.540.442.494,-. APBD. Hasil perhitungan dan analisis biaya yang dilakukan temyata diperoleh biaya total proses perencanaan dan penganggaran Dinas Kesehatan Provinsi Sulawesi Tengah sebesar Rp. 259.794.844,- yang keseluruhannya merupakan biaya operasional kegiatan per tahapan aktivitas tersebut. Permasalahan dan hambatan yang dihadapi dalam proses perencanaan dan penganggaran adalah 1)sektor kesehatan belurn menjadi prioritas 2)Belum optimalnya S1K, 3)belum adanya SK Kadis tentang SDM perencanaitim penyusun dokumen perencanaan dan penganggaran dinas. 4)Da.ftar harga satuan barangijasa belum sepenuhnya dimanfaatkan sebagai acuan.5) Belum adanya Juklak perencanaan clan penganggaran, 6)belum semua personil yang terlibat proses perencanaan dan penganggaran belum teriatih secara tehnis maupun. manajerial. 7)Koordinasi Lintas Program (LP) belum optimal. 8) Perencanaan & penganggaran yang dilakukan selama ini belum terpadu, terpisah antara perencanaan APBN dengan APBD. Begitu pula dengan tenaga perencananya. APBN oleh Seksi Penyusunan Program sedangkan APBD oleg Subag Keuangan. 9)Belum adanya dana yan khusus dialokasikan untuk aktivitas perencanaan clan penganggaran. 10)Belum adanya risetistudi sejenisnya mengenai analisis biaya programikegiatan untuk acuaniperbandingan kearah perbaikan. 11)Masalah yang sifatnya spesifik lokal yakni seringkali terjadi pemadarnan lampu oleh PLN. Penelitian ini menyimpulkan perlu dilakukan berbagai upaya dan penataan sena pembenahan baik secara temis maupun manajerial dala.m proses perencanaan dan penganggaran. Upaya sosialisasi dan advokasi yang lebih intensif kepada stakeholder/decision maker setempat juga masih perlu ditingkatkan.


Central Sulawesi Provincial Health Office, have many problems and scarcity of many aspect like planning officer, SIK and budget. Have not budget allocaction for the planning and budgeting process. This study aim to conduct a special cost analysis for the process of health planning and budget by using Activity Based Costing (ABC) concept. This study is a qualitative design, researcher used a framework system which covered input, process and output to analyze various aspect which related to planning and budget process. Public Health Service in the Central Sulawesi Province has conducted all planning activities steps, starting from situation analysis, identify problem, decision of problem priority, decision of aim, determination of trouble-shooting alternative, arrangement of Project Operational Planning. (ROP), Making of RICA - ICL and RICA - SKPD, assistance, correction and revision, final document of planning and budget until draft arrangement of DIPA and DPA at Public Health Service in 2007. Although their implementation are not always conducted alternately or separated step by step. Some aspects which affected to planning and budget at Public Health Service in the province of Sulawesi Tengah is availability, sufficiency, compatible and also the equipment of various resources, such as Human Resources Development planner, medium, timing, fund, schedule, implementation guide (Juklak), supported decentralisation policy, Health Information System (5I1C) and standard price of service unit. Available planning and budget activity is part of Policy Program and Health Development Management at Public Health Service. Available fund allocation in this program is destined for some Subdin, department, section and sub section at Public Health Service in the province of Sulawesi Tengah. Fund allocation of this prograrne in 2007 are 6.706.789.494,- rupiahs which consist of 5.166.347.000,- rupiahs from APBN and 1.540.442.494,- rupiahs from province APB1). From calculation result and cost analysis which has conducted was obtained total cost of planning and budget process at Public Health Service in the province of Sulawesi Tengah are 259.794.844,- rupiahs which all of them are operational cost in every activities steps. Problems and resistances which are faced on planning and budget process such as: 1) Health sector does not become a priority yet concerning a local OTDA policy, because Kamtibrnas is more important aspect. 2) SIK is not optimal yet, 3) There is no SK ICadis concerning Human Resources Development of planner or compiler team of planning and budget document at Health Service. 4) Price list of material or service unit is not fully exploited as reference yet 5) There is no Juklak of planning and budget, 6) All personals who concerned on planning and budget process are not trained yet both technically and managerial. 7) Program pass coordination (LP) is not optimal yet. 8) Planning and budget which conducted are not solid yet, separated between APBN and APBD planning and also their planner. APBN is arranged by section of program arrangement while APBD is arranged by sub department of financial. 9) There are no funds which are allocated especially for planning and budget activity. 10) There is no study which concerns on cost analysis program or activity for reference on repair. 11) Local problems specifically are often happen extinction of electric by PLN. This study concluded that it was important to be conducted various effort and administration and also correction both technique and managerial on planning and budget process at Public Health Service in the province of Sulawesi Tengah. Socialization effort and more intensive advocation to stakeholder or decision maker is also improved.

Read More
T-2552
Depok : FKM-UI, 2007
S2 - Tesis   Pusat Informasi Kesehatan Masyarakat
cover
Arizon Desra; Pembimbing: Amal C. Sjaaf
S-3564
Depok : FKM UI, 2004
S1 - Skripsi   Pusat Informasi Kesehatan Masyarakat
cover
Asdi Basri; Pembimbing: Engkus Kusdinar Achmad
Abstrak:
Perencanaan kesehatan adalah salah satu fungsi yang dilaksanakan terlebih dahulu sebelum pelaksanaan fungsi-fungsi lainnya dalam manajemen. Rendahnya kualitas usulan .perencanaan kesehatan dapat disebabkan oleh berbagai faktor. Untuk mendapatkan gambaran tentang faktor-faktor tersebut perlu dilakukan penelitian, Penelitian ini dilaksanakan di Dinas Kesehatan Kota Padang Panjang yang diadakan selama bulan Oktober 2000 dengan menggunakan metode kualitatif memakai teknik wawancara mendalam dan diskusi kelompok terarah. Secara umum, penelitian ini menemukan adanya berbagai faktor yang diduga bahwa usulan perencanaan kesehatan tahunan di Dinas Kesehatan Kota Padang Panjang masih jauh dari sempurna. Dan dibuat oleh satu orang saja yakni Kepala Sub Bagian Tata Usaha. Hal ini disebabkan usulan perencanaan yang dibuat hanya bersifat lembaran kerja, tanpa mempunyai tujuan yang jelas, tidak berkesinambungan dan dibuat oleh tenaga perencana yang belum terlatih serta tidak memperkirakan faktor penghambat atau pendorong pada waktu pelaksanaan dan tidak dapat menyesuaikan keadaan oleh sangat jarangnya dilakukan bimbingan teknis tentang perencanaan, tidak adanya pendelegasian wewenang secara tertulis, kurangnya koordinasi lintas program dan lintas sektor, tidak terlibatnya staf secara penuh, pengetahuan dan kemampuan para perencana tentang proses perencanaan yang masih kurang serta tidak adanya supervisi tentang proses perencanaan. Berdasarkan hasil-hasil yang sudah dikemukakan di atas maka kualitas usulan tahunan kesehatan relatif rendah, disarankan agar Dinas Kesehatan Kota Padang Panjang melakukan pembenahan terhadap manajemen perencanaan kesehatan dengan menempatkan urusan perencanaan ke dalam struktur yang ada, meningkatkan Pembinaan tentang perencanaan, meningkatkan pengetahuan dan kemampuan perencanaan melalui pelatihan dan pendidikan. Hal lain yang perlu diperhatikan adalah perlunya pendelegasian wewenang secara tertulis, melibatkan staf secara penuh dan meningkatkan kerja lama. lintas program dan lintas sektor.

The Analysis of Factors Expected to Correlase to Low Quality of Proposed Annual Health Planning at Health Department of Padang Panjang District, 1999/2000Health planning is the first function which has to be done before doing the other management functions. Low quality of proposed annual health planning can be caused by many factors. This study was carried out at Dinas Kesehatan Kota Padang Panjang in October 2000. Data were collected through in depth interview, focus group discussion and observation. In general, this study found that the proposed annual health planning at Dinas Kesehatan Kota Padang Panjang is still low in quality. It was correlated with the form of proposed document which was made only in working sheet only, without clear direction, no continuation, no prediction to the strenght and weakness is in time of action, inability to adapt to the situation caused by poor technical guide in the process of health planning, no written delegation of authority, poor coordination and cooperation between program holders and correlated sectors, poor staff who involves fully in the health planning process, poor knowledge and skill in health planning, and no supervision about health planning. It seemed that the proposed was made by contrained worker. Based on the results above the the quality proposed annual health planting was low. It is suggested Dinas Kesehatan Kota Padang Panjang to look into health management by increasing the technical guide of health planning including knowledge and skill through training. Besides that, it is important to restrict the delegation of authority, to involve staffs fully in the health planning process and to increase the coordination and cooperation between program holders and other correlated sectors.
Read More
T-1005
Depok : FKM UI, 2001
S2 - Tesis   Pusat Informasi Kesehatan Masyarakat
cover
Laidin Saragih; Pembimbing: Ascobat Gani
T-89
Jakarta : FKM UI, 1984
S2 - Tesis   Pusat Informasi Kesehatan Masyarakat
:: Pengguna : Pusat Informasi Kesehatan Masyarakat
Library Automation and Digital Archive