Hasil Pencarian :: Kembali

Ditemukan 40348 dokumen yang sesuai dengan query ::  Simpan CSV
cover
I Ketut Surdiana; Pembimbing: Robiana Modjo
S-1757
Depok : FKM UI, 2000
S1 - Skripsi   Pusat Informasi Kesehatan Masyarakat
cover
Dewi Rotua; Pembimbing: Robiana Modjo
S-3826
Depok : FKM UI, 2004
S1 - Skripsi   Pusat Informasi Kesehatan Masyarakat
cover
Muslich Riza; Pembimbing: Hendra
S-1904
Depok : FKM UI, 2000
S1 - Skripsi   Pusat Informasi Kesehatan Masyarakat
cover
Nurlina; Pembimbing: Sjahrul M. Nasri
S-3282
Depok : FKM UI, 2003
S1 - Skripsi   Pusat Informasi Kesehatan Masyarakat
cover
Carsiwan; Pembimbing: Kusminanti, Yuni
M-1378
[s.l.] : [s.n.] : s.a.]
D3 - Laporan Magang   Pusat Informasi Kesehatan Masyarakat
cover
Nur Najmi Laila; Pembimbing: Sjahrul Meizar Nasri; Penguji: Mila Tejamaya, Baiduri, Uswatun Hasanah, Trisnajaya
Abstrak: Laboratorium X adalah salah satu fasilitas di Fakultas Kedokteran dan IlmuKesehatan (FKIK) UIN Jakarta yang menunjang fasilitas belajar dalam pendidikan.Berdasarkan hasil pendataan awal, terdapat 120 bahan kimia yang terdapat dalamlaboratorium X ini. Hasil studi pendahuluan belum memadainya upaya pengendalianyang dijalankan seperti belum tersedianya MSDS (Material Safety Data Sheet) secaralengkap di Laboratorium X, pelabelan yang belum tepat, penggunaan APD (AlatPelindung Diri) yang belum sesuai dan lain-lain diperkirakan dapat meningkatkanrisiko keselamatan dan kesehatan kerja (K3) di Laboratorium X ini.Penelitian ini dilakukan untuk mengidentifikasi, analisa dan evaluasimanajemen laboratorium pada aspek keselamatan dan kesehatan kerja diLaboratorium X FKIK UIN Syarif Hidayatullah Jakarta tahun 2016 denganmenggunapan beberapa standar acuan. Penelitian ini bersifat kualitatif denganmelakukan observasi, wawancara serta telaah dokumen. Penelitian ini dilakukan daribulan April-Juni 2016.Hasil penelitian menunjukkan beberapa elemen masih belum sesuai denganstandar manajemen laboratorium yaitu belum tersedianya draft sistem manajemen dansystem manajemen mutu laboratorium, belum adanya sistem transportasi danpenerimaan bahan kimia, lemari penyimpanan bahan kimia yang belum sesuai, sistemtanggap darurat yang belum lengkap, belum dilakukannya penilaian manajemenresiko dan biomonitoring pada pekerja.Saran yang dapat diberikan yaitu Penting harus segera dilakukan adalahmenyusun kembali system manajemen lab, Menyusun system manajemen mutu,Menyusun Sistem Tanggap Darurat dan Pelatihan keadaan darurat di Lab, MelakukanPenilaian Risiko yang ada di lab secara menyeluruh dan Melakukan pemeriksaankesehatan pada pegawai secara berkala.Kata Kunci : system manajemen laboratorium, system manajemen mutulaboratorium, keselamatan dan kesehatan kerja, bahan kimia
Laboratory X is one of the facilities in Faculty of Medicine and Health Sciences(FKIK) UIN Jakarta that support learning in educational. Based on the initial data,there are 120 chemicals contained in this X lab. Results of a preliminary study ofinadequate control measures undertaken such as the placement of chemicalsubstances that have not been right, not completely of MSDS (Material Safety DataSheet), labeling is not proper, use of PPE (Personal Protective Equipment) is notappropriate and others are expected to increase the risk of occupational safety andhealth in this laboratory.This study was done to identify, analyze and evaluate laboratory management aspectsof Health and Safety in the Laboratory X FKIK UIN Syarif Hidayatullah Jakarta in2016 with some reference standards. This is a qualitative study by observation,interviews and review of documents. This research was conducted from April to June2016.The results showed some elements are still not in accordance with the standards ofthe laboratory management, such as the unavailability of draft management systemsand quality management system of the laboratory, no transport system and acceptanceof chemicals, chemicals storage are not appropriate, emergency response system thatis not yet complete, never done risk management assessment and biomonitoring ofworkers.Faculty is advised that is important has to be done is rearrange the systemmanagement lab, Develop quality management systems, Develop EmergencyResponse System and Training of emergency in the Lab, Conducting RiskAssessment in the lab thoroughly and Perform health checks on employees on aregular basis.Keywords: laboratory management system, laboratory quality management systems,occupational health and safety, chemicals.
Read More
T-4614
Depok : FKM-UI, 2016
S2 - Tesis   Pusat Informasi Kesehatan Masyarakat
cover
Jasmanto; Pembimbing: Ramdhan, Doni H
M-773
[s.l.] : [s.n.] : s.a.]
D3 - Laporan Magang   Pusat Informasi Kesehatan Masyarakat
cover
Miranty Jasmine Gayatri; Pembimbing: Syahrul Meizar Nasri; Penguji: Robiana Modjo, Rita Setiya Ningrum
S-6604
Depok : FKM UI, 2011
S1 - Skripsi   Pusat Informasi Kesehatan Masyarakat
cover
Widhayanti Dian Saputri; Pembimbing: Sjaff, Ridwan Zahdi
M-2183
[s.l.] : [s.n.] : s.a.]
D3 - Laporan Magang   Pusat Informasi Kesehatan Masyarakat
cover
M Rohmat Fakhrurrozi; Pembimbing: L Meily Kurniawidjaja; Penguji: chandra Satrya, Juned Eryanto
Abstrak: Perkembangan konstruksi yang semakin meningkat mempunyai risiko tinggiterhadap kecelakaan kerja. Sistem manajemen keselamatan dan kesehatan kerjasebagai sarana mencegah terjadinya kecelakaan dan kerugian lainnya yang ditimbulkan. Tujuan penelitian adalah mengetahui pelaksanaan SMK3 melaluianalisis temuan ketidak sesuaian hasil audit eksternal OHSAS 18001 dibandingkan dengan PP RI no.50 tahun 2012 di proyek pembangunan Apartemen Bogor Valley Residence dan Hotel tahun 2014. Penelitian ini merupakan studi deskriptifanalitik. Metode pengambilan data melalui wawancara dengan 3 informan dandata sekunder. Hasil telitian menunjukkan bahwa tingkat penerapan SMK3 di PTX menurut PP RI no.50 tahun 2012 sebesar 96,9%, yang merupakan tingkatan lanjutan yang harus dipertahankan atau ditingkatkan. Sedangkan penyebab temuan audit adalah tidak adanya peralatan alat ukur, tidak adanya SOP penanganan bahan kimia, perencanaan program yang tidak tepat, tidak adanya SOP perbaharui dokumen, dan terakhir yaitu kurangnya pengawasan/inspeksi area berbahaya. Secara keseluruhan penyebab temuan adalah kurangnya dukungan dan partisipasiaktif dari manajemen baik Pusat maupun proyek terhadap program K3. Kata Kunci : SMK3, Temuan audit OHSAS 18001, PP RI no.50 Tahun 2012
The development of the growing construction have a high risk of work accidents.Occupational health and safety management systems as a means of preventing theoccurrence of accidents and other damage caused. The purpose of this study isknowing the implementation of SMK3 through analysis OHSAS 18001 externalaudit results compared with PP RI No. 50/2012 on project development BogorValley Residence apartments and hotels. Design study is a descriptive analytic.Method of data acquisition through interviews with three informants andsecondary data. The results showed that the level of adoption research SMK3 inPT X by PP RI No. 50 of 2012 as much as 96.9%, which is an extension formshould be preserved or enhanced. While the causes of the audit findings are notthe tools of measurement, not the SOP chemical handling, improper planningprogram, not the SOP renew documents, and lack of supervision and inspectionof hazardous areas. On the whole causes of the findings are the lack of supportand active participation from top management and project management for K3program.Keywords : SMK3, Audit OHSAS 18001, PP RI no.50/2012
Read More
S-8337
Depok : FKM-UI, 2014
S1 - Skripsi   Pusat Informasi Kesehatan Masyarakat
:: Pengguna : Pusat Informasi Kesehatan Masyarakat
Library Automation and Digital Archive