Ditemukan 33025 dokumen yang sesuai dengan query :: Simpan CSV
Robot is a complex and complicated machine with the ability to move at differentspeeds and in different directions. The interaction between human, robot andenvironment contribute to create risk endangering people and property which islocated around the robot. Based on information from the official website of theUS labor department from 1984 to 2013. There have been 37 fatal accidents in theworkplace related to robots. This thesis discusses the risk assessment carried outon the operation and maintenance work of the robot at PT X. Identification ofdanger in this study using a job hazard analysis (JSA / JHA) and the calculation ofthe risk value using semi-quantitative analysis method. The results of this studyprovide an overview of risk level operation and maintenance work of the robot,where the highest risk is hit by a robot arm while doing the work operation andmaintenance robot. The risk level is obtained from the combination of theprobability of occurrence and severity of impact. These research give somerecommendation to control residual risks.
This study analysis implementation of fire safety system at A and B buildings PT X in 2020 using Fire Safety Evaluation System (FSES). The purpose of this study was to know the condition of fire safety system at A and B building PT X. The design research was a descriptive with approach to semi quantitative. The building A and B are buildings for office activities. The evaluation was carried out for 12 safety parameters according to NFPA 101A: Alternate Approaches to Life Safety with the NFPA 101: Life Safety Code standard. The parameters evaluated are building construction, hazard separation, vertical openings, sprinklers, fire alarms, smoke detectors, 2 interior finish, smoke control, exit access, evacuation routes, corridors/ compartment and emergency response programs. Additional analysis was also carried out on passive protection system, active protection system, and lifesaving facilities in building A and B. The result showed that the implementation of fire safety at A and B building PT X still met the minimum value of fire safety in the office building based on the mandatory requirements in FSES.
