Ditemukan 24992 dokumen yang sesuai dengan query :: Simpan CSV
Martina; Pembimbing: Fatma Lestari; Penguji: Dadan Erwandi, Yuni Kusminanti
S-6822
Depok : FKM UI, 2011
S1 - Skripsi Pusat Informasi Kesehatan Masyarakat
☉
Dannial Mubarak; Pembimbing: Fatma Lestari; Penguji: Dadan Erwandi, Kurniawan
S-7377
Depok : FKM UI, 2012
S1 - Skripsi Pusat Informasi Kesehatan Masyarakat
☉
Sandi Mulya; Pembimbing: Fatma Lestari; Penguji: Dadan Erwandi, Edi Jajang
Abstrak:
Tingginya tuntutan untuk dapat berkompetensi era globalisasi dan MEA menumbuhkan kesadaran masyarakat menempuh pendidikan tinggi, hal ini tentunya ditunjang dengan pemenuhan infrastruktur yang baik dalam bidang pendidikan. Untuk memenuhi kebutuhan infrastruktur tersebut pihak Universitas Indonesia melimpahkan kepada pihak kontraktor. Pekerjaan proyek konstruksi merupakan pekerjaan yang berbahaya dan berisiko tinggi, untuk itu diperlukan suatu sistem yang baik sehingga dapat melindungi para pekerja dan lingkungan kerja (karena berada dalam lingkup Universitas Indonesia) dalam bidang konstruksi yang dinamakan Sistem Manajemen Keselamatan, Kesehatan Kerja, dan Lingkungan (SMK3L) Kontraktor. Penelitian ini, penulis berpedoman pada Pedoman Pelaksanaan Manajemen Kontraktor Universitas Indonesia. Pengumpulan data dilakukan dengan cara wawancara, telaah dokumen, dan observasi langsung ke lapangan. Pada tahap kualifikasi dimenangkan oleh PT Intraco Lestari dengan nilai pemenuhan kualifikasi sebesar 71%. Pada tahap pelaksanaan, peneliti melakukan inspeksi langsung ke lapangan dengan menggunakan formulir inspeksi dengan berpedoman pada Pedoman Pelaksanaan Manajemen Kontraktor Universitas Indonesia, hasilnya PT Intraco Lestari memperoleh nilai rata-rata 8 dari total nilai 10. Peneliti tidak melakukan pada tahap evaluasi dikarenakan proyek pembangunan gedung vokasi tahap dua masih dilakukan dan belum selesai. Peneliti memberikan rekomendasi kepada PT Intraco Lestari untuk terus melakukan perbaikan pada poin-poin yang kurang dan memberikan perhatian pada poin-poin yang belum dilakukan sesuai dengan formulir inspeksi pada kegiatan konstruksi di Universitas Indonesia.
The high demands to be competent globalization and MEA raising public awareness through higher education, it must be supported with the good infrastructure in the field of education. To meet the infrastructure needs of the Indonesian University authorities delegated to the contractor. Works construction project is a work in dangerous and high risk, it is necessary for a good system so as to protect workers and the working environment (because it is within the scope of the University of Indonesia) in the field of construction, called a Contractor Safety Health Environment Management System (CSHEMS). This study, the authors based on the Guidelines for the Implementation Contractor Management Universitas Indonesia. The data collection is done by means of interviews, review of documents, and direct observation to the field. In the qualifying stage was won by PT Intraco Lestari with the value of the fulfillment of qualifications by 71%. During the implementation phase, researchers conducted an inspection directly to the field by using the inspection form based on the Guidelines for the Implementation Contractor Management Universitas Indonesia, PT Intraco Lestari result obtained average value 8 of the total value of 10. The researchers did not conduct the evaluation stage due to the vocational building project stage two is still ongoing and not yet completed. Researchers provide recommendations to PT Intraco Lestari to continuing to improve on the points that are less and give attention to the points which have not been carried out in accordance with the inspection form on construction activities at the University of Indonesia.
Read More
The high demands to be competent globalization and MEA raising public awareness through higher education, it must be supported with the good infrastructure in the field of education. To meet the infrastructure needs of the Indonesian University authorities delegated to the contractor. Works construction project is a work in dangerous and high risk, it is necessary for a good system so as to protect workers and the working environment (because it is within the scope of the University of Indonesia) in the field of construction, called a Contractor Safety Health Environment Management System (CSHEMS). This study, the authors based on the Guidelines for the Implementation Contractor Management Universitas Indonesia. The data collection is done by means of interviews, review of documents, and direct observation to the field. In the qualifying stage was won by PT Intraco Lestari with the value of the fulfillment of qualifications by 71%. During the implementation phase, researchers conducted an inspection directly to the field by using the inspection form based on the Guidelines for the Implementation Contractor Management Universitas Indonesia, PT Intraco Lestari result obtained average value 8 of the total value of 10. The researchers did not conduct the evaluation stage due to the vocational building project stage two is still ongoing and not yet completed. Researchers provide recommendations to PT Intraco Lestari to continuing to improve on the points that are less and give attention to the points which have not been carried out in accordance with the inspection form on construction activities at the University of Indonesia.
S-9229
Depok : FKM-UI, 2016
S1 - Skripsi Pusat Informasi Kesehatan Masyarakat
☉
Sandra Memori; Pembimbing: Fatma Lestari; Penguji: Dadan Erwandi, Yuni Kusminanti
S-6329
Depok : FKM UI, 2011
S1 - Skripsi Pusat Informasi Kesehatan Masyarakat
☉
Miranty Jasmine Gayatri; Pembimbing: Syahrul Meizar Nasri; Penguji: Robiana Modjo, Rita Setiya Ningrum
S-6604
Depok : FKM UI, 2011
S1 - Skripsi Pusat Informasi Kesehatan Masyarakat
☉
Tirta Yadi; Pembimbing: Fatma Lestari; Penguji: Dadan Erwandi, Chandra Satrya, Yuni Kusminanti
T-3613
Depok : FKM-UI, 2012
S2 - Tesis Pusat Informasi Kesehatan Masyarakat
☉
Angga Putra; Pembimbing: Fatma Lestari; Penguji: Dadan Erwandi, Zulkifli Djunaidi, Yuni Kusminanti, Donanta Dhaneswara
T-3358
Depok : FKM UI, 2011
S2 - Tesis Pusat Informasi Kesehatan Masyarakat
☉
Puteri Salsabila; Pembimbing: Mila Tejamaya; Penguji: Indri Hapsari Susilowati, Sjahrul Meizar Nasri, Akhmad Ridho, Hani Ramadhani
Abstrak:
Laboratorium merupakan tempat yang kondusif untuk melakukan eksperimen, investigasi, dan observasi, dimana pada aktivitasnya melibatkan berbagai macam bidang ilmu. Aktivitas pembelajaran di laboratorium tidak terlepas dari potensi bahaya keselamatan, kesehatan, dan lingkungan, seperti bahaya kimia, fisika, biologi, bahkan bahaya keadaan darurat. Hal tersebut dapat dicegah dengan melakukan manajemen risiko melalui implementasi aspek Sistem Manajemen Keselamatan, Kesehatan Kerja, dan Lingkungan (SMK3L) Laboratorium. Penelitian ini bertujuan untuk menganalisis implementasi SMK3L di laboratorium Universitas Indonesia (UI). Penelitian ini merupakan studi deskriptif dengan pendekatan kuantitatif yang dilakukan pada laboratorium UI pada tahun 2020. Pencapaian implementasi SMK3L diukur menggunakan media berupa formulir centang inspeksi laboratorium yang telah dikembangkan oleh UI dan dengan beberapa penyempurnaan. Formulir centang ini memiliki 157 pertanyaan yang mencangkup 15 aspek SMK3L berupa pertanyaan tertutup. Skor inspeksi tersebut kemudian dianalisis menggunakan metode gap analysis. Hasil analisis secara keseluruhan menunjukkan bahwa laboratorium UI telah memenuhi standar penerapan aspek SMK3L laboratorium yang telah ditentukan oleh batas pencapaian skor ≥ 70% (Lab A2 : 76%; Lab A4 : 78%; Lab A9 : 81%; Lab A10 : 78%; Lab F5 : 74%; Lab F12 : 73%; Lab F13 : 80%; Lab F14 : 85%; dan Lab G19 : 95%), dengan jangkauan penilaian terendah dan tertinggi pada masing-masing aspek SMKL nya (komitmen dan kebijakan : 50-100% ; perencanaan : 50-95% ; implementasi : 79-97% ; pengendalian operasional : 75-94% ; pemeriksaan : 33-100% ; tinjauan manajemen : 0100%). Adapun, tindakan peningkatan dan perbaikan masih harus dilakukan khususnya pada aspek dengan kesenjangan tertinggi, yaitu pengendalian operasional, yang terletak pada tata graha laboratorium, sistem inventarisasi alat dan bahan, dan persiapan keadaan darurat. Selain aspek tersebut, aspek pemeriksaan dan tinjauan manajemen pun masih harus ditingkatkan dengan melaksanakan audit.
Read More
T-6093
Depok : FKM-UI, 2021
S2 - Tesis Pusat Informasi Kesehatan Masyarakat
☉
Syarif Usman; Pembimbing: Fatma Lestari; Penguji: Dadan Erwandi, Yuni Kusminanti
T-3308
Depok : FKM UI, 2011
S2 - Tesis Pusat Informasi Kesehatan Masyarakat
☉
Rosdja Purnama; Pembimbing: Chandra Satrya
T-1531
Depok : FKM UI, 2003
S2 - Tesis Pusat Informasi Kesehatan Masyarakat
☉
