Hasil Pencarian :: Kembali

Ditemukan 41132 dokumen yang sesuai dengan query ::  Simpan CSV
cover
Suhandi Lubis; Pemb. Budi Hidayat; Penguji: Atik Nurwahyuni, Nurjamil, Ismawiningsih
T-3971
Depok : FKM UI, 2013
S2 - Tesis   Pusat Informasi Kesehatan Masyarakat
cover
Fahlepi Indriansyah; Pembimbing: Puput Oktamianti; Penguji: Prastuti Soewondo, Vetty Yulianty Permanasari, Intan Widayati, Maliki Arif Budianto
Abstrak:
Penelitian ini bertujuan untuk menganalisis penyebab rendahnya realisasi anggaran Bantuan Operasional Kesehatan (BOK) Salur tahun 2023 di Puskesmas Kabupaten Bogor dengan menggunakan pendekatan Public Financial Management (PFM). Hasil penelitian menunjukkan bahwa serapan anggaran yang rendah disebabkan oleh beberapa faktor utama, antara lain kurangnya pemahaman juknis terhadap batasan pelaksanaan dari menu BOK salur, rendahnya satuan biaya yang ditetapkan oleh pemerintah daerah, masih kurangnya pemahaman penata laporan SPJ oleh PPTK dan penata keuangan bendahara. Hal ini mengindikasikan adanya kelemahan dalam sinkronisasi antara tahap perencanaan, penganggaran, dan pelaksanaan anggaran di tingkat Puskesmas. Selain itu, terbatasnya kapasitas teknis dan manajerial pelaksana juga mempengaruhi pelaksanaan program. Oleh karena itu, diharapkan pemerintah daerah dapat lebih mempertimbangkan lagi satuan unit cost agar mendorong kinerja dan motivasi kerja. Peningkatan kapasitas SDM dan penguatan koordinasi lintas sektor untuk memastikan efektivitas penggunaan dana BOK Salur.This study aims to analyze the causes of the low realization of the 2023 Health Operational Assistance (BOK) Salur budget at the Bogor Regency Health Center using the Public Financial Management (PFM) approach. The results of the study indicate that low budget absorption is caused by several main factors, including a lack of understanding of technical instructions on the implementation limits of the BOK Salur menu, low unit costs set by the local government, and a lack of understanding of the SPJ report organizer by PPTK and the treasurer's financial administrator. This indicates a weakness in the synchronization between the planning, budgeting, and budget implementation stages at the Health Center level. In addition, the limited technical and managerial capacity of the implementers also affects program implementation. Therefore, it is hoped that local governments can further consider the unit cost unit to encourage work performance and motivation. Increasing human resource capacity and strengthening cross-sector coordination to ensure the effectiveness of the use of BOK Salur funds.
Read More
T-7370
Depok : FKM UI, 2025
S2 - Tesis   Pusat Informasi Kesehatan Masyarakat
cover
Retno Prihastuti; Pembimbing: Ascobat Gani; Penguji: Prastuti Soewondo, Pujiyanto, Iyan Apriyanto, Efraim Mudumi
Abstrak:
Dana Alokasi Khusus (DAK) Nonfisik Bidang Kesehatan digunakan untuk operasional bidang kesehatan untuk program Upaya Kesehatan Masyarakat (UKM). Realisasi anggaran Bantuan Operasional Kesehatan (BOK) Puskesmas tahun 2022 yaitu 69,32%. Kabupaten Tangerang mencapai realisasi anggaran BOK Puskesmas sebesar 86,11%. Penelitian ini bertujuan mengetahui dan menganalisis faktor-faktor yang berhubungan dengan realisasi anggaran BOK Puskesmas Kabupaten Tangerang tahun 2022. Penelitian merupakan penelitian non-eksperimental dengan pendekatan kualitatif. Pengumpulan data dilakukan melalui wawancara mendalam dan telaah dokumen. Hasil penelitian menunjukkan perencanaan penganggaran belum sesuai juknis, ketersediaan SDMK tidak berhubungan dengan realisasi anggaran BOK Puskesmas, petunjuk teknis belum dapat diimplementasikan seluruhnya. Pengelolaan yang fektif, pelaporan yang tepat waktu dan monitoring dan evaluasi berhubungan dengan realisasi anggaran BOK Puskesmas yang optimal. Sistem informasi/aplikasi dalam pengelolaan BOK Puskesmas belum digunakan oleh Puskesmas di tahun 2022 sehingga tidak dapat dibuktikan hubungannya terhadap realisasi anggaran. Non-physical Special Allocation Funds (DAK Nonfisik) for the Health Sector Nonfisik are allocated for health sector operation for the community health effort (UKM).

The realization of the Health Operational Assistance (BOK) budget for Puskesmas in 2022 is 69,32%. Tangerang Regency achieved the realization of the BOK Puskesmas budget of 86,11%. This realization has quite wide variations from 97,41% to 72,33%. This research aims to determine and analyze the factors related to the realization of the BOK budget for Tangerang regency in 2022. The research is non-experimental research with a qualitative approach. Data collection was carried out through in-dept interview and document review. The result of the research show that planning and budgeting is not accordance to technical guidelines, availability of health human resources is not related to the realization of BOK budget and technical guidelines can not fully implemented. Effective management, timely reporting, and monitoring and evaluation related to realization of the optimal BOK Puskesmas budget. Information system/application in managing BOK Puskesmas has not been used by Puskesmas in 2022 so the relationship to budget realization cannot be proven.

Read More
T-7173
Depok : FKM UI, 2025
S2 - Tesis   Pusat Informasi Kesehatan Masyarakat
cover
Ika Herayana Noviani; Pembimbing: Ascobat Gani; Penguji: Kurnia Sari, Prastuti Soewondo, Mira Miranti Puspitasari, Rizky Andriani Alimy
Abstrak:
Tesis ini membahas tentang bagaimana penyerapan anggaran BOK Puskesmas dengan metode salur langsung melalui evaluasi formatif penyerapan anggaran Bantuan Operasional Kesehatan (BOK) Puskesmas Salur Langsung Di Kota Depok Tahun 2023. Ini merupakan penelitian Non Eksperimental dengan pendekatan kualitatif berupa studi kasus pada 6 Puskesmas di Kota Depok, 3 Puskesmas dengan penyerapan baik dan 3 Puskesmas dengan penyerapan sedang. Metode pengumpulan data dengan wawancara mendalam dikonfirmasi dengan telaah dokumen.

This thesis examines the implementation of the direct disbursement method in the absorption of Health Operational Assistance (BOK) funds at Puskesmas in Depok City. The study conducts a formative evaluation of budget absorption for Directly Disbursed Health Operational Assistance (BOK) at Puskesmas in Depok City in 2023, using a non-experimental research design with a qualitative case study approach. The study focuses on six Puskesmas in Depok City: three with good absorption rates and three with moderate absorption rates. Data collection was conducted through in-depth interviews.
Read More
T-7195
Depok : FKM UI, 2025
S2 - Tesis   Pusat Informasi Kesehatan Masyarakat
cover
Iswanto; Pembimbing: Vetty Yulianty Permanasari; Penguji: Kurnia Sari, Izanuddin
Abstrak:

Dana bantuan operasional kesehatan (BOK) bertujuan untuk membiayai operasional kegiatan di Puskesmas dalam rangka peningkatan indikator kinerja standar pelayanan minimal (SPM) di puskesmas. Penelitian ini bertujuan untuk menganalisis implementasi penggunaan dana BOK Puskesmas dalam pencapaian kinerja SPM di Kabupaten Buton Utara. Penelitian ini merupakan penelitian observasional dengan rancangan studi kasus dan pendekatan kualitatif. Studi kasus dilakukan di Puskesmas Kulisusu, Puskesmas Bonerombo, dan Puskesmas Wakorumba Utara Kabupaten Buton Utara pada Oktober 2022 hingga Juli 2023. Hasil penelitian menemukan bahwa pada faktor input yaitu dari sisi sumber daya manusia (SDM), jumlahnya masih belum lengkap dan masih ada beberapa posisi yang diisi oleh tenaga kesehatan yang bukan keahliannya. Selain itu, para SDM tersebut juga memiliki berperan ganda (double job). Kelengkapan sarana dan prasarana di puskesmas juga belum mencukupi seperti standar sarana untuk pelaksanaan program dalam SPM yang menghambat pelaksaan program yang termasuk dalam SPM. Selain itu, peralatan penunjang (misalnya pemeriksaan laboratorium) dan jaringan internet sebagian belum terpenuhi. Ketersediaan anggaran puskesmas mengalami kendala karena anggaran yang diturunkan belum berbasis kinerja dan bukan berdasarkan sepenuhnya usulan dari puskesmas. Pada faktor proses, impelementasi anggaran dana BOK puskesmas dilakukan melalui penyusunan RUK dan RPK, tetapi untuk penentuan pagu anggaran tetap ditentukan oleh pemerintah pusat. Waktu pencairan dana BOK mengalami keterlambatan yang dimulai dari telat turunnya dana BOK ke kas daerah karena terlambatnya pengiriman laporan dari tahun sebelumnya. Selain itu, Puskesmas juga menunggu keluarnya DPA sebagai penjabaran dari APBD yang baru bisa keluar di akhir bulan Maret. Hal tersebut semakin rumit disebabkan inisiatif pencairan dana BOK oleh Puskesmas baru dilakukan pada bulan Juli hingga Agustus. Keterlambatan turunnya dana ke Puskesmas tersebut berpengaruh pada terhambatnya pelaksanaan program kegiatan di awal tahun yang menggunakan BOK dan mengganggu realisasi program UKM di Puskesmas. Hal tersebut berdampak pada pencapaian indikator kinerja SPM di Puskesmas Bonerombo, Kulisusu, dan Wakorumba Utara yang mengalami penurunan dan masih banyak yang dibawah target. Kata kunci: bantuan operasional kesehatan, dana, sumber daya manusia, sarana prasarana, implementasi, kinerja


 

The health operational assistance funds aim to finance operational activities at community health centers (CHCs) to improve the minimum service standard (MSS) performance indicators. The current study aimed to analyze the implementation of HOA funds at CHCs in achieving MSS performance in North Buton Regency. An observational study was performed using a case study design and a qualitative approach. Case studies were conducted at the Kulisusu Health Center, Bonerombo Health Center, and North Wakorumba Health Center at North Buton Regency from October 2022 to July 2023. The study found that the input factor, namely from the human resources side, was still inadequate, and unskilled health workers still filled several positions. In addition, these human resources also had a double role. The facilities and infrastructure at the CHCs were also insufficient, such as the standard of facilities for implementing programs in the MSS, which hinders the program implementations. In addition, some of the supporting tools (e.g., laboratory equipment) and internet networks have not been fulfilled. The availability of the CHCs budget is facing problems because it has been reduced, not based on performance, and not entirely based on suggestions from the CHCs. In the process factor, implementation of the HOA budget for CHCs was carried out through the preparation of the Proposed Activity Plan (PAP) and Activity Implementation Plan (AIP), but the central authorities still determined the determination of the budget ceiling. The timing of the disbursement of HOA funds was delayed, starting with the transfer of HOA funds to the local treasury due to the delay in submitting reports from the previous year. Apart from that, the CHCs were also waiting for the Budget Implementation Document (BID) to be released as an elaboration of the new Regional Expenditure Budget and Revenue (REBR), which came out at the end of March. It is even more complicated because the initiative to disburse HOA funds by the CHCs is only carried out from July to August. The delay in the disbursement of funds to the CHCs affected the implementation of program activities that used the HOA funds at the beginning of the year and disrupted the realization of the Community Health Efforts (CHE) program at the CHCs. It had an impact on the achievement of performance indicators for MSS at the Bonerombo, Kulisusu, and North Wakorumba Community Health Centers, which experienced a decline and many were still below target. Key words: health operational assistance, funds, human resources, infrastructure, implementation, performance

Read More
T-6793
Depok : FKM-UI, 2023
S2 - Tesis   Pusat Informasi Kesehatan Masyarakat
cover
Dwi Sunarjadi; Pembimbing: Prastuti C. Soewondo; Penguji: Jaslis Ilyas, Prayudhy Yushananta, Rooswanti Soeharno
Abstrak:

Pusat Kesehatan Masyarakat (Puskesmas) mempunyai tugas pokok menyelenggarakan pelayanan kesehatan dasar yang menyeluruh, bermutu, terjangkau oleh masyarakat dan sebagai motor pembangunan kesehatan di wilayah kerjanya. Mutu pelayanan kesehatan dasar di Puskesmas dirasakan masih belum memadai. Banyak faktor yang mempengaruhinya, antara lain standar pelayanan dan pembiayaan. Sampai saat ini biaya pelayanan kesehatan terutama di Puskesmas sangat min:m sehingga op rasional Puskesmas masih banyak mendapat subsidi baik dari pemerintah pusat maupun dari pemerintah daerah. Penelitian ini bertujuan untuk memperoleh gambaran kecukupan pembiayaan kesehatan bersumber pemerintah di Puskesmas Baradatu Kabupaten Way Kanan pada tahun 2006. Ruang lingkup penelitian dilaksanakan di wilayah kerja Puskesmas Baradatu Kabupaten Way Kanan dengan membatasi area penclitian pada pembiayaan kesehatan bersumber pemerintah dari berbagai tingkatan yang dialokasikan dan dikelola oleh Puskesmas Baradatu yang ditelusuri pada tahw1 anggaran 2006. Desain penelitian yang dipergunakan adalah penelitian operasional. Data yang dikumpulkan adalah data sekunder yang berasal dari alokasi anggaran tahun 2006 dan diambil dari doktllllen di masing•masing instansi pengelola serta data sasaran dan cakupan program di Puskesmas Baradatu. Analisis pencapaian program pelayanan kesehatan di Puskesmas Baradatu dilakukan dengan mengacu pada indikator Standar Pelayanan Minimal bidang kesehatan. Pencapaian program pelayanan kesehatan Puskesmas Baradatu rendah yaitu baru 57,8% indikator program prioritas SPM yang sudah dijalankan sesuai dan melebihi target. Pembiayaan kesehatan pemerintah tahun 2006 sebesar Rp.l.292.814.897,­dimana 85,57% dari APBD Kabupnten Way Kanan dan 14,43% dari APBN. Anggaran APBD Kabupaten Way Kanan 84,49% berasal dari DASK Puskesmas Baradatu sedangkan 15,51% berasal dari DASK Dinas Kesehatan Kabupaten Way Kanan. Estimasi pembiayaan kesehatan sebesar Rp. 35.316,- atau US$ 3,85 per kapita pertahun. Perkiraan kebutuhan biaya operasional pelayanan kesehatan berdasarkan pencapaian program prioritas SPM Puskesmas Baradatu tahun 2006, sebesar Rp.377.427.084,-. Penyelenggaraan pelayanan kesehatan dasar dan obat membutuhkan biaya operasional t rbesar. Total kebutuhan pembiayaan kesehatan bersumber pemerintah sebesar Rp.1.410.507.627,- Kesenjangan yang terjadi sebesar Rp.l17.692.730,- disebabkan kekurangan biaya operasional anggaran bersurnber APBD Kabupaten Way Kanan sebesar 10,64%. Keadaan ini menyebabkan rendahnya pencapaian program prioritas SPM Puskesrnas Baradatu tahun 2006. Disarankan agar penyusunan perencanaan anggaran berdasarkan Standar Pelayanan Minimal, dengan mengalokasikan pembiayaan secara efektif dan efisien. Untuk mengatasi keterbatasan anggaran pernerintah dilakukan upaya rnenaikkan anggaran secara bertahap dari tahun ke tahun disesuaikan dengan kecenderungan kenaikan pemerintah hingga kebutuhan tersebut masih dapat ditanggung oleh daerah.


The Community Health Center (CHC)/Puskesmas have a main task to conduct the basic health services comprehensively, alified, and affordable by the community, and act as the motor of the health development of its work area. However, the quality of the basic health services is still far from expectation. There are a lot of factors that affected, such as: the standard of the services and its cost Until this day, the cost for health services, especially at puskesmas is very low. Therefore, the operational cost of the puskesmas still have subsidized from the central and provincial government. The study has a purpose on describing the appropriate health cost that resourced from the government, at Baradatu Puskesmas of the District of Way Kanan in the year of 2006. The study is carried out in the area of working of the puskesmas with a limitation of The analysis of target program achievement of the health services at Baradatu Puskesmas is obtaining by referring the indicators of Minimum Standard of Health Services (MSHS). It is found that the coverage of health services program at Baradatu Puskesmas is still low, i.e. only 57.8%, but indicators on priority program of MSHS that have been applied are appropriate and over the target. Government health cost in 2006 is about 1,292,814,817,00 rupiah (one billion and two hundred ninety two million eight hundred fourteen thousand and eight hundred seventeen rupiah), where 85.5% of it is from the Provincial Budget and Expenditure (APBD) and 14.43% is from the Central Budget and Expenditure (APBN). The APBD of the District of Way Kanan is 84.49% from the DASK Puskesmas Baradatu, and its 15.51% is from the DASK of the District Health Authority of Way Kanan. It is estimated that the health cost at the District of Way Kanan is about 35,316 rupiah or$ 3.85 per-capita per­ year. Estimation for cost health services operational need based on program achievement on MSHS priority of Baradatu Puskesmas in the year of 2006 is around 377,427,084 rupiah. The implementation of the basic health services and medication need a considerable operational cost. The total needed on health services that resourced from the government is 1,410,507,627 rupiah. The disparity produced is 117,692,730 rupiah, caused by 10.46% of the shortage of operational budget from APBD resourced from the District of Way Kanan. The situation that lead to the low on target achieved by program priority of MSHS at Baradatu Puskesmas in 2006. It is suggested that planning arrangement for budget based on MSHS, should be allocated efficiently and effectively. To deal with the limitation of the government budget, an increasing the budget year by year should be attempted in corresponds with the elevation on government budget Therefore, the cost needed can be managed by the district.

Read More
T-2725
Depok : FKM-UI, 2007
S2 - Tesis   Pusat Informasi Kesehatan Masyarakat
cover
Wahyu Pudji Nugraheni; Pembimbing: Mardiati Nadjib; Penguji: Hasbullah Thabrany, Ayi Raffiah, Hendrianto Trisnowibowo
Abstrak:

Menyadari semakin terbatasnya kemampuan pemerintah utamanya dalam hal pembiayaan, maka berkembanglah konsep kemitraan dengan swasta dalam pembangunan kesehatan di Indonesia. Penelitian ini merupakan penelitian kasus yang dilakukan di RSUD "X" yang bermitra dengan pihak swasta. Pengumpulan data dilakukan dengan 2 cara yaitu secara kuantitatif dengan mencatat data keuangan yang ada dan kualitatif dengan melakukan wawancara mendalam dengan informan terpilih. Perhitungan biaya di PKS dilakukan dengan dua cara yaitu Full Cost (menghitung biaya yang seharusnya dikeluarkan oleh PKS) dan Variabel Cost (menghitung biaya yang benar-benar dikeluarkan oleh oleh PKS).Hasil Penelitian menunjukkan bahwa kemitraan yang dijalin antara RSUD "X" dengan pihak swasta dalam membangun gedung rawat inap dengan fasilitas VIP (PKS) adalah dengan sistem B.0.T yaitu bagi hasil selama 10 tahun dari hasil sewa kamar dengan formula 60% pihak swasta dan 40% pihak RSUD "X". Pengelolaan PKS dilakukan oleh Koperasi Pegawai RSUD "X".Dari penelusuran biaya pada tahun 2001 diperoleh bahwa biaya total di PKS pada tahun 2001 adalah sebesar Rp. 2.912.323.106,-(Full Cost) dan Rp.2.225.133.800,-(Variabel Cost). Biaya terbesar di PKS adalah biaya operasional yaitu sebesar 80,91% dari seluruh biaya yang ada(Full Cost). Sedangkan biaya operasional terbesar adalah untuk alokasi biaya personil yaitu 53,35% dari total biaya operasional yang ada. Total pendapatan PKS pada tahun 2001 adalah Rp.2.894.887.000,-. Adapun CRR PKS tahun 2001 adalah 99,40% (Full Cost) dan 130,10% (Variabel Cost). Pada tahun 2001 PKS tidak menghasilkan SHU atau PKS dalam keadaan defisit yaitu sebesar (Rp.I7.436.106,-) (Full Cost). Tetapi apabila dihitung secara Direct Cost, PKS mendapatkan SHU sebesar Rp.669.753,200,-.Dari hasil wawancara mendalam diperoleh informasi bahwa PKS tidak melakukan subsisdi silang kepada RSUD "X". Trend pendapatan dan pengeluaran PKS sejak mulai didirikan sampai tahun 2001 terlihat relatif meningkat baik yang dihitung secara current price maupun constant price. Dari hasil forecasting selama 10 tahun (1996-2005) menunjukkan bahwa dari kemitraan tersebut, pihak investor mendapatkan keuntungan sebesar Rp. 872.849.930,- sedangkan pihak RSUD "X" mengalami kerugian sebesar Rp.3.108.259.938,-.Dengan melihat hasil forecasting dapat diketahui bahwa investor swasta merupakan pihak yang paling diuntungkan dalam kemitraan tersebut. Dan pemerintah dalam hal ini RSUD "X" merupakan pihak yang dirugikan. Salah satu harapan dalam kerjasama atau kemitraan dengan swasta di lingkungan RSUD "X" adalah terwujudnya subsidi silang dari PKS kepada RSUD "X" , namun dalam kenyataannya subsidi silang tersebut lama sekali tidak terwujud.


 

Government-Private Partnership in Hospital Services in Financing and Cross Subsidy Perspective (Case Study in Hospital "X")Constraints of the government to finance healthcare services had ignited the concept of government - private sector partnership in hospital services. This study is a case study in a district government hospital "Z" which had started partnering with private sector in developing a new in-patient hospital service (PKS). Data collection has been done using quantitative data collection and qualitatively explored using in-depth interviews with selected informants. Cost calculations in PKS were done using two methods: full cost (calculating the costs that should have been borne by PKS) and direct cost (calculating the costs that has actually been borne by PKS).The partnership of this district hospital with private sector took place in the form of private sector build a new VIP in-patient building using BOT arrangement for 10 years period. Revenue from bed usage will be divided 60% to the private investor and 40% to the hospital. The cost of PKS services in 2001 was Rp. 2,912,323,106 (full cost) and Rp. 2,225,133,800 (direct cost). Operating cost has the highest share of the total cost (full cost). Within the operating cost category, staff cost ranks first with 53.35%.Total revenue of PKS in 2001 was Rp 2,894,887,000. Cost Recovery Rate of the PKS in 2001 was 99.40% (full cost) and 130.10% (direct cost). PKS in the year 2001 was deficit (Rp. 17, 436, 106,-) (full cost). But if calculation by direct cost, PKS gain profit Rp. 669,753,200).From the in-depth interview, it was found that cross subsidy was not take place from PKS to the hospital. Trends of the revenue and costs of PKS from its beginning to 2001 were found increasing both in current and constant price. From forecasting, for a period of 10 years (1996-2005), it was found that from this partnership private investor will gain Rp. 872,849,930,- and the hospital would loose Rp. 3,108,259,938.From the forecasting, it was found that the private investor will gain benefit from this partnership while the hospital will not. One of the reasons from the development of government-private partnership in this hospital is to provide cross subsidy from the PKS to the hospital. However, this notion has not been realized so far.

Read More
T-1320
Depok : FKM-UI, 2002
S2 - Tesis   Pusat Informasi Kesehatan Masyarakat
cover
Liniatuddiana; Pembimbing: Prastuti C. Soewondo; Penguji: Puput Oktamianti, Alamsyah, Leslie K. Waruwu
Abstrak: Penanganan masalah gizi sangat penting untuk meningkatkan kualitas sumberdaya manusia. Salah satu input untuk dapat mencapai target Standar Pelayanan Minimal (SPM) program gizi adalah kecukupan pendanaan. Penelitian ini bertujuan untuk mengetahui kesenjangan kebutuhan pembiayaan yang membandingkan antara kebutuhan berdasarkan perhitungan biaya SPM dengan realisasi belanja program gizi di tahun 2016 dan 2017. Penelitian ini juga sekaligus mendapat gambaran proses perencanaan, penganggaran dan kesenjangan anggaran yang ada. Penelitian kualitatif ini menggunakan rancangan potong lintang. Hasil penelitian menunjukkan adanya kenaikan realisasi anggaran program gizi yang cukup tinggi di Dinas Kesehatan Kabupaten Bekasi, dari Rp 3.931.449.461 di tahun 2016 menjadi Rp. 9.146.251.165 di tahun 2017. Pemanfaatan realisasi anggaran tersebut paling banyak digunakan untuk kegiatan preventif berupa pemberian makanan tambahan untuk ibu hamil Kekurangan Energi Kronis (KEK) dan balita kurus yaitu sebesar 66,55% pada tahun 2016 dan sebesar 59,35% di tahun 2017. Hasil penelitian ini mengungkap bahwa total realisasi belanja lebih besar daripada total kebutuhan biaya berdasarkan SPM. Besarnya kebutuhan biaya SPM program gizi tahun 2016 dari 4 jenis pelayanan dasar dalam SPM adalah sebesar Rp 1.779.095.450 pada tahun 2016 dan Rp. 2.347.821.493 tahun 2017. Terdapat kelebihan sebesar Rp. 2.152.354.011 pada tahun 2016 dan Rp. 6.798.429.672 pada tahun 2017. Berdasarkan hasil wawancara mendalam diketahui bahwa dalam proses perencanaan sudah dilakukan analisa masalah, penetapan tujuan dan dilakukan identifikasi kegiatan. Proses penganggaran yang dilakukan sudah berbasis kinerja karena telah membuat anggaran berdasarkan skala prioritas dan telah menetapkan indikator kinerja.
Kata Kunci: Kesenjangan biaya, Program Gizi, Perencanaan & Penganggaran

Increasing nutrition and overcoming the issues surrounding it is essential in increasing the quality of human resources in Indonesia. One of the important input aspects to achieve minimum standard services (SPM) is sufficient budget allocation. This study aims to uncover the discrepancy between budget realization and budget estimations of minimum standard services (SPM) for the nutrition program in 2016 and 2017; as well as to understand the planning and budgeting process. This was a qualitative study with a cross sectional design, utilizing resources of financial data and program implementation. Results of the study revealed that budget realization of nutrition program at Bekasi Municipal Health Office in 2016 and 2017 were Rp 3,931,449,461 and Rp. 9,146,251,165 respectively. The majority of the budget was directed to preventive programs where in 2016 comprised of 66.55% and in 2017 was 59.35% of the total nutrition budget. Total spending realized was higher than the yearly total budget estimations based on minimum standard services (SPM). There was excess in budget in 2016 of Rp. 2,152,354,011 and Rp. 6,798,429,672 in 2017. In-depth interviews revealed the planning process already includes extensive problem analysis, objective determination and activities identification. The budgeting process is already based on work performance due to it priority scale budgets and established. Bekasi Municipal Health Office should continue to pursue its commitment in improving health budget planning and budget efficiency.
Key words: Budget Gap, Nutrition Program,Health Planning and Budgeting
Read More
T-5307
Depok : FKM UI, 2018
S2 - Tesis   Pusat Informasi Kesehatan Masyarakat
cover
Samsul Bahri; Pemb. Mardiati Nadjib; Penguji: Ede Surya Darmawan, Prastuti C. Soewondo, Ferry Yanuar, Lukman Hakim
Abstrak:

Malaria merupakan penyakit menular yang masih menjadi masalah kesehatan di dunia. diperkirakan ± 1,5 juta - 2.7 juta jiwa meninggal setiap tahunnya. Di Indonesia Pada tahun 2002 dilaporkan ada 15 juta kasus klinis. Dilaporkan bahwa dibeberapa daerah malaria masih endemis terutama daerah terpencil dan sebagian besar penderitanya dari goIongan ekonomi lemah. Dari 2 I kabupaten /kota di NAD,66 6% merupakan daerah endemis malaria. Kabupatcn Aceh Tenggara yang merupakan daerah pegunungan dengan jarak 900 km dari ibu kota provinsi selama empat tahun berturut-turut megalami kenaikan kasus malaria. Pada tahun 2003 teroatat 741 kasus, 2004 tercatat 531 kasus, 2005 tercatat 1.112 kasus dan 2006 tercatat l.787 kasus kejadian malaria. Perhatian dunia terhadap malaria cukup besar. Hal ini ditandai dengan penandatanganan perjanjian antara Global Fund, pemerintah Jerman dan pemerintah Indonesia yang berbunyi menghapus hutang Indonesia sebesar 50juta euro (600 milyar) dengan syarat setengah dari dana tersebut digunakan untuk program pemberantasan penyakit menular termasuk malaria. Program pemberantasan penyakit malaria merupakan palayanan esensial yang harus disubsidi oleh pemerintah dalam upaya mencapai ?kesehatan untuk semua? (health for all) sesuai dengan kemampuan Negara Indonesia. Diharapkan Dinas Kesehatan Kaabaupaten dapat mempengaruhi para pengambil keputusan di daerah untuk mendapaatkan prioritas dana APBD Kabupaten guna membiayai program malaria. Penelitian ini ingin melihat anggaran program pemberantasan penyakit malaria di Dinas Kesehatan Kabupaten Aceh Tenggara pada tahun 2005 s/d 2007 dimulai dari proses perencanaan penerimaan anggaran dari berbagai sumber peruntukan anggaran tersebut, siapa pegelolanya dan bagaimana dukungan pemangku kepentingan. Penelitian ini merupakan penelitian operasional dengan pendekatan kualitatif dan kuantitalif yang bersifiat deskriftif. Hasil penelitian menemukan pembiayaan program pemberantasan penyakit malaria di Dinas Kesehatan Kabupeten Aceh Tenggara pada tahun 2005 sld 2007 menunjukan hanya terdapat dua sumber yaitu ABPD Kab dan BLN yang jumlahnya cenderung naik yaitu tahun 2005 Rp 314,480.000, tahun 2006 Rp 444.380.000 dan tahun 2007 Rp 2.806.450.000. Pembiayaan operasional hampir tidak ada perubahan dari tahun ketahun. Komponen biaya terbesar adalah pemberian kelambu sebesar Rp. 2.512.200.000. Biaya untuk kuratif sangat sedikit yaitu hanya Rp 86.970.000. selama tahun 2005 s/d 2007. Dari hasil wawancara mendalam dengan peieabat terkait diperoleh gambaran bahwa keinginan mereka untuk memberantas: penyaki.t malaria cukup tinggi hanya saja belum diikuti dengan jumlah anggaran. Penelitian ini menyarankan agar pengelola Program pemberantasan penyakit malaria Dinas Kesahatan Kabupaten Aceh Tenggara lebih aktif lagi mencari sumber pembiayaan lain, tidak hanya bertumpun pada sumber yang ada sekarang dengan cara membuat perencanaan yang tepat dan melakukan advocasi ke pemerintah daerah.


Malaria is a communicable disease that is still be one of health problem throughout tbe world. There are estimated ± I ,5 - 2,7 million people died every year because of malaria. It has been reported that there were 15 miliion cases in Indonesia in 2002. Malaria is still be an endemic disease in rural area and most of patients are the poor people. There are 21 districts in NAD and 66 6%malatia. Aceh Tenggara District is a mountainous area in the distance of 900 km from capital city. For 4 years malaria cases increased year to year. In 2003, it was recorded that there were 741 cases, 842 cases in 2004, !.!12 cases in 2005 and 1.787 cases in 2006. The international contribution toward malaria is great enough. The MOU bertween global fund, German and Indonesia has been signed, it stated they agreed to eliminate Indonesia debt at anount 50 million Euro (600 million) with a specific condition that half of that loan should be used to eliminate communicable disease including malaria. Malaria elimination program is an essential service subsidized by government to achieve "health for all" in accordance with government ability. It's expected that District Health Office (Dinas Kesehatan Kabupaten) could influence the district policy stake holder to get a priority budget from Annual district budget called ?APBD? for malaria program This study was aimed to describe the budget of malaria program in district health office in Aceh Tenggara in 2005 to 2007. This study enrolled the planning budgeting process, financing sources, agent, provider and beneficiary for malaria program. This study was on descriptive operational study with qualitative and quantitative approaches. The results of study showed that the sources of fund are District APBD and BLN. The funding tends to increase from Rp. 314.480.000 in 2005, Rp. 444.380.000 in 2006 to Rp. 2.806.450.000 in 2007. The major component of 1hat funding waspurchasing mosquito net and it cost 2.512.200.000. Curative funding component is only 86.970.000 from 2005 to 2007. The result of study recommended 1hat the District Hea1th Office ( Dinkes ) ofAceh Tenggara should proactively find others potential resources, not only depending on the available resourcesby making a better planning process and advocate district government.

Read More
T-2973
Depok : FKM UI, 2008
S2 - Tesis   Pusat Informasi Kesehatan Masyarakat
cover
Euis Herna Marlyna; Pemb. Wahyu Sulistiadi; Penguji: Pujiyanto, Budiarti Setianingsih, Ade Saprudin
T-3940
Depok : FKM UI, 2013
S2 - Tesis   Pusat Informasi Kesehatan Masyarakat
:: Pengguna : Pusat Informasi Kesehatan Masyarakat
Library Automation and Digital Archive