Hasil Pencarian :: Kembali

Ditemukan 7 dokumen yang sesuai dengan query ::  Simpan CSV
cover
Tomi Wahyu Hadi; Pembimbing: Fihir, Izhar M.
M-2307
[s.l.] : [s.n.] : s.a.]
D3 - Laporan Magang   Pusat Informasi Kesehatan Masyarakat
cover
Tomi Wahyu Hadi; Pemb. Ridwan Z. Sjaaf; Penguji: Hendra, Nurul Chotimah
S-5238
Depok : FKM UI, 2008
S1 - Skripsi   Pusat Informasi Kesehatan Masyarakat
cover
Muhyidin; Pembimbing: Sjahrul Meizar Nasri; Penguji: Mila Tejamaya, Hendra, Elsye As Safira, Tomi Wahyu Hadi
Abstrak: Tesis ini membahas analisis kebisingan kerja di Pembangkit Listrik Tenaga Panas Bumi dan hubungannya dengan tekanan darah dan risiko hipertensi pada pekerja. Desain penelitian dengan metode cross-sectional menggunakan data primer (usia, jenis kelamin, masa kerja, kebiasaan merokok, penggunaan APT, dan stres) menggunakan kuesioner dan data sekunder (intensitas kebisingan, indeks massa tubuh, diabetes, kolesterol total, LDL / low density lipoprotein, dan tekanan darah pekerja) yang diperoleh dari PT XYZ. Sebanyak 101 pekerja berpartisipasi dalam penelitian ini dengan purposive sampling sesuai similar exposure group (SEG). Uji analisis Mann-Whitney dan Chi Square digunakan untuk melihat hubungan antara variabel dependen dan variabel independen. Intensitas kebisingan diukur menggunakan noise dosimeter selama 8 jam kerja.

Hasil penelitian menunjukkan pekerja yang terpajan kebisingan >80 dBA memiliki tekanan darah dan prevalensi hipertensi yang lebih tinggi dibandingkan pekerja yang terpajan kebisingan ≤80 dBA. Pekerja yang terpajan kebisingan >80 dBA memiliki tingkat risiko terkena hipertensi lebih tinggi dengan OR = 3,19 dibandingkan dengan pekerja yang terpajan kebisingan ≤80 dBA. Tidak ada hubungan antara intensitas kebisingan dengan tekanan darah dan hipertensi. Akan tetapi terdapat kecenderungan dosis-respon antara intensitas kebisingan dengan tekanan darah sistolik, tekanan darah diastolik dan hipertensi
Read More
T-6326
Depok : FKM-UI, 2022
S2 - Tesis   Pusat Informasi Kesehatan Masyarakat
cover
Taufik Octaviano; Pembimbing: Ridwan Zahdi Syaaf; Penguji: DOni Hikmat Ramdhan, Irma Primadiati, Tomi Wahyu Hadi
T-4225
Depok : FKM-UI, 2014
S2 - Tesis   Pusat Informasi Kesehatan Masyarakat
cover
Nely Isdiarti; Pembimbing: Ridwan Zahdi Syaaf; Penguji: Doni Hikmat Ramdhan, Meizar Rahman, Tomi Wahyu Hadi
T-4174
Depok : FKM-UI, 2014
S2 - Tesis   Pusat Informasi Kesehatan Masyarakat
cover
Tomi Wahyu Hadi; Pembimbing: Dadan Erwandi; Penguji: Sjahrul M. Nasri, Farida Tusafariah, Susanto Kusnadi
Abstrak:

Sekarang ini, di industri geothermal serta minyak dan gas, tren penggunaan tenaga kontraktor semakin meningkat. Hal ini tentu saja diikuti oleh  meningkatnya resiko keselamatan kerja yang dihadapi oleh pekerja kontraktor, dengan demikian peran dari sistem manajemen keselamatan & kesehatan kerja kontraktor – Contractor SHE management system (CSMS) menjadi semakin penting untuk diperhatikan. Tujuan penelitian ini adalah untuk mengidentifikasi faktor-faktor yang menyebabkan rendahnya tingkat implementasi CSMS di PT. X unit bisnis geothermal pada tahun 2011. Penelitian ini merupakan penelitian kualitatif dengan desain deskriptif komparatif, menggunakan elemen-elemen dalam panduan sistem manajemen OHSAS sebagai referensi untuk mendapatkan faktor-faktor yang akan diidentifikasi. Jenis data yang digunakan adalah data primer dan sekunder, sedangkan pengumpulan data dilakukan dengan observasi lapangan, wawancara dan studi literatur. Berdasarkan hasil penelitian diketahui bahwa faktor-faktor yang menyebabkan rendahnya tingkat implementasi CSMS di PT. X unit bisnis geothermal pada tahun 2011 adalah faktor dokumentasi yaitu kurang informatifnya form yang disediakan pada tahap pre job dan faktor sumber daya dimana belum ditetapkan sumber daya yang disediakan untuk menjadi representasi SHE. Saran yang diberikan adalah dengan merevisi form pada tahap pre job, kemudian dengan membuat penugasan tertulis mengenai sumber daya yang ditunjuk untuk malakukan peran dan tanggung jawab dari representasi SHE. Kata kunci, Sistem manajemen Kesehatan & Keselamatan Kerja Kontraktor.


 

Right now, in geothermal, oil & gas industry, the tren of using contractor workforce is increasing. Of course this condition followed by the increase of health and safety risk faced by the contractor’s workers. Therefore the role of Contractor SHE Management System (CSMS) become more and more important to be noted. The objective of this research was to identify the cause factors of CSMS low implementation rate in geothermal unit business of PT. X in 2011. This research using Qualtative methode with Comparative Descriptive design. This research using elements of OHSAS management system guideline as a reference to get theidentify factors which will be analyzed, the data used was primary and secondary. The research found that the factor which causing low implementation rate of CSMS in geothermal unit business of PT. X in 2011 was the factor of document, that the form of pre job phase which was not informative and the factor of human resource, that the resource for the SHE representative was not yet decided. It is sugested to revise the form in pre job phase to be more informative and to make a writen assignment of personnel who will take the role & responsibility of SHE representative. Keyword Contractor Safety Management System, CSMS

Read More
T-3651
Depok : FKM UI, 2012
S2 - Tesis   Pusat Informasi Kesehatan Masyarakat
cover
Rizky Zulkarnaen; Pembimbing: Fatma Lestari; Penguji: Zulkifli Djunaidi, Mila Tejamaya, Muhidin, Tomi Wahyu Hadi
Abstrak: Pipa sebagai sistem penyaluran atau distribusi menjadi kebutuhan utama di industri minyak dan gas bumi saat ini. Namun penggunaan jalur pipa ini tersimpan bahaya sehingga menjadi salah satu sumber bahaya utama instalasi minyak dan gas bumi di dunia. Penilaian risiko fasiltas operasi di industri minyak dan gas bumi mutlak diperlukan untuk melihat tingkat kegagalan dan kehandalan sistem operasi fasilitas tersebut. Fasilitas CGP SKW PTJM akan dilakukan perubahan fasilitas, salah satunya adalah pipa penyalur LPG existing 8 inchi sepanjang 110 km yang akan menjadi pipa penyalur pipa kondensat dari CGP SKW ke ORF J. Keadaan tersebut menyebabkan diperlukannya penilaian risiko kembali fasilitas pipa existing 8 inchi sepanjang 110 km. Penelitian ini dilakukan untuk mendapatkan gambaran risiko relatif keberadaan jalur pipa kondensat ukuran 8 inchi dari CGP SKW ke ORF J sepanjang 110 km. Penelitian dilakukan dengan menggunakan metode semi kuantitatif model W. Kent Muhlbauer tahun 2004. Pembagian seksi pipa dilakukan berdasarkan kepemilikan lahan, tipe penggunaan lahan, kedalaman pipa, buoyancy control, teknik konstruksi, tipe proteksi katodik dan tipe vegetasi sehingga menghasilkan 12 seksi jaringan pipa. Dari hasil penelitian diperoleh indek risiko yang paling rendah adalah indek indek kesalahan pihak ketiga dengan nilai (69,50), setelah itu indek desain dengan nilai (70,50), urutan berikutnya adalah indeks korosi dengan nilai sebesar (71,33), dan indeks yang tertinggi adalah indek kesalahan operasi dengan nilai sebesar 85. Faktor dampak kebocoran tertinggi terdapat pada seksi 1, 9, 11 dan 12 dengan nilai 5,25. Faktor dampak kebocoran terendah terdapat pada seksi 2,4,6,7 dan 10 dengan nilai 1,75. Seksi pipa yang paling berisiko untuk mengalami kegagalan paling tinggi adalah seksi 1, 11 dan 12 dengan nilai 56,95. Sedangkan seksi pipa yang paling tidak berisiko untuk mengalami kegagalan adalah seksi 6 dengan nilai 174,29. PTJM berdasarkan standar AS/ANZ 4360 harus melakukan pengelolaan risiko dengan prioritas puncak pada seksi pipa 1,3,5,8,9, 11 dan 12. Variabel risiko yang dapat dilakukan peningkatan oleh PTJM antara lain indek kerusakan pihak ketiga (line locating, public education, ROW condition dan patrol frequency), indeks korosi (proteksi internal, tes timbal, close interval survey condition dan internal inspection), indeks desain (corrective action) dan indeks kesalahan operasi (safety system, SCADA, training dan mechanical error preventer). Kata kunci: Penilaian risiko, Jalur Pipa, Metode Semi Kuantitatif Model Muhlbauer, Risiko Relatif
Read More
T-4278
Depok : FKM-UI, 2015
S2 - Tesis   Pusat Informasi Kesehatan Masyarakat
:: Pengguna : Pusat Informasi Kesehatan Masyarakat
Library Automation and Digital Archive