Ditemukan 6 dokumen yang sesuai dengan query :: Simpan CSV
Nelvi Arvina; Pembimbing: Zulkifli Djunaidi; Penguji: Dadan Erwandi, Ramadansyah Siregar
S-7670
Depok : FKM UI, 2013
S1 - Skripsi Pusat Informasi Kesehatan Masyarakat
☉
Herdina Jane Pusphachinta; Pembimbing: Zulkifli Djunaidi; Penguji: Doni Hikmat Ramdhan, Devie Fitri Octaviani
S-8125
Depok : FKM UI, 2014
S1 - Skripsi Pusat Informasi Kesehatan Masyarakat
☉
Padhanta Ginting; Pembimbing: Chandra Satrya; Penguji: Hendra, Henny D. Mayawati
S-8266
Depok : FKM UI, 2014
S1 - Skripsi Pusat Informasi Kesehatan Masyarakat
☉
Fahzrin Perwitasari; Pembimbing: Dadan Erwandi; Penguji: Ridwan Z. Sjaaf, Adrianus Pangaribuan
Abstrak:
Skripsi ini membahas tentang analisis risiko pada sepuluh tahapan proses yang terdapat pada bagian Low Pressure Die-Casting, PT X plant Onepack Cikarang. Penelitian ini menggunakan desain penelitian deskriptif yang mengacu pada Australian Standar/New Zealand Standard (AS/NZS) 4360 : 2004. Metode yang digunakan dalam analisis risiko adalah metode semi-kuantitatif formula matematika W.T.Fine. Tujuan penelitian adadalah mendapatkan tingkat risiko K3 pada proses kerja LPDC PT X Plant Onepack Cikarang. Hasil penelitian adalah jenis-jenis risiko dan tingkat risiko yang ditentukan dari nilai risiko yang dimiliki pada masing-masing dari sepuluh tahapan proses dibagian LPDC tersebut.
Kata kunci : Analisis risiko, tingkat risiko, nilai risiko.
This final paper discusses about the risk analysis of ten flow procces in Low Pressure Die Casting PT X Plant Onepack Cikarang. This Research used descriptive research design that refer to Australian Standar/New Zealand Standard (AS/NZS) 4360 : 2004. The method which is used in this risk analysis is semi-quantitative method of W.T.Fine math formula. The Objective research is getting the level of occupational safety and health risk of work procces in LPDC PT X plant onepack Cikarang. The result of the research is kind of risks and risk level that determined based on risk values which are had by each risks of ten flow procces.
Keyword : risk analysis, risk level, risk value
Read More
Kata kunci : Analisis risiko, tingkat risiko, nilai risiko.
This final paper discusses about the risk analysis of ten flow procces in Low Pressure Die Casting PT X Plant Onepack Cikarang. This Research used descriptive research design that refer to Australian Standar/New Zealand Standard (AS/NZS) 4360 : 2004. The method which is used in this risk analysis is semi-quantitative method of W.T.Fine math formula. The Objective research is getting the level of occupational safety and health risk of work procces in LPDC PT X plant onepack Cikarang. The result of the research is kind of risks and risk level that determined based on risk values which are had by each risks of ten flow procces.
Keyword : risk analysis, risk level, risk value
S-9169
Depok : FKM UI, 2016
S1 - Skripsi Pusat Informasi Kesehatan Masyarakat
☉
Rizka Hidayati; Pembimbing: Chandra Satrya; Penguji: Dadan Erwandi, Doni Setiawan
Abstrak:
Penelitian ini membahas tentang penilaian risiko keselamatan dan kesehatan kerja pada aktivitas finishing proyek pembangunan Pejaten Park Residence PT. PP Persero Tbk. tahun 2016. Penilaian risiko dilakukan untuk mendapatkan nilai risiko yang terdapat pada aktivitas finishing work di PT. PP Persero Tbk. Identifikasi bahaya dan risiko menggunakan Job Hazard Analysis (JHA). Analisis tingkat risiko menggunakan standar level risiko kualitatif AS/NZS 4360:2004. Penelitian ini menggunakan desain studi cross sectional dengan pendekatan observasi dan wawancara. Nilai risiko adalah hasil perkalian dari konsekuensi, dan kemungkinan. Hasil penelitian menyatakan bahwa terdapat 80 risiko yang ada pada proses finishing work.
This study discusses the occupational health safety risk assessment on finishing work activity in Pejaten Park Resoidence Project by PT. PP Persero Tbk on 2016. Risk assessment carried out to obtain the value of the risk inherent in the activity of finishing works in Pejaten Park Resoidence Project by PT. PP Persero Tbk. Hazard identification and risk using the Job Hazard Analysis (JHA). Analysis of the level of risk using the standard risk level qualitative AS/NZS 4360:2004. This study used a cross-sectional study design with observational approach. Value is the result of multiplying the risk of consequences and probabilities. The study states that there are 80 existing risk in the process of structural works.
Read More
This study discusses the occupational health safety risk assessment on finishing work activity in Pejaten Park Resoidence Project by PT. PP Persero Tbk on 2016. Risk assessment carried out to obtain the value of the risk inherent in the activity of finishing works in Pejaten Park Resoidence Project by PT. PP Persero Tbk. Hazard identification and risk using the Job Hazard Analysis (JHA). Analysis of the level of risk using the standard risk level qualitative AS/NZS 4360:2004. This study used a cross-sectional study design with observational approach. Value is the result of multiplying the risk of consequences and probabilities. The study states that there are 80 existing risk in the process of structural works.
S-9194
Depok : FKM UI, 2016
S1 - Skripsi Pusat Informasi Kesehatan Masyarakat
☉
Indra Putra Hendrizal; Pembimbing: Zulkifli Djunaidi; Penguji: Doni Hikmat Ramdhan, Devie Fitri Octaviani
Abstrak:
Analisis risiko pada pipa 6” crude oil SP PDT I - SP Tambun di PT Pertamina EP Region Jawa Field Tambun tahun 2013 ini dilakukan mengingat adanya potensi bahaya dan risiko yang mengancam keselamatan pekerja dan masyarakat di sekitar jalur pipa. Penelitian yang bersifat deskriptif analitik dan dilakukan dengan menggunakan metode analisis semi kuantitatif ini bertujuan untuk mendapatkan nilai dan level risiko yang ada. Hasil penelitian yang menggunakan sistem skoring berdasarkan Model Studi Zulkifli Djunaidi ini menunjukkan bahwa nilai probabilitas dari pipa yang diteliti adalah 13,05 poin dengan nilai konsekuensi sebesar 5,11 poin. Berdasarkan perhitungan, nilai risiko relatif-nya adalah 2,55 sehingga termasuk level risiko High Risk berdasarkan Tabel ALARP Kriteria (EPA, 2004). Oleh sebab itu, perlu dilakukan tindakan perbaikan dan pengendalian yang tepat untuk risiko yang memberikan kontribusi besar terhadap kemungkinan terjadinya kebocoran, kebakaran, dan ledakan pada pipa.
Risk analysis for 6” crude oil pipeline system SP PDT I - SP Tambun at PT Pertamina EP Java Region Field Tambun 2013 has to be done because the presence of the hazards and risk potential that threats not only employee’s safety but also people’s safety around the pipeline Right of Way (ROW). This analytical descriptive research that uses semi-quantitative analytical method has a purpose to assess the existing risk score and risk level. The result of this research that uses scoring system based on Zulkifli Djunaidi’s Study Model shows that the probability’s score is 13.05 points and the consequence’s score is 5.11 points. Based on calculation, the relative-risk score is 2.55 and belongs to High Risk Level based on ALARP Criteria Table (EPA, 2004). Therefore, an appropriate improvement and controlling system need to be performed for the pipeline major risks by PT Pertamina EP Java Region Field Tambun.
Read More
Risk analysis for 6” crude oil pipeline system SP PDT I - SP Tambun at PT Pertamina EP Java Region Field Tambun 2013 has to be done because the presence of the hazards and risk potential that threats not only employee’s safety but also people’s safety around the pipeline Right of Way (ROW). This analytical descriptive research that uses semi-quantitative analytical method has a purpose to assess the existing risk score and risk level.
S-8031
Depok : FKM-UI, 2013
S1 - Skripsi Pusat Informasi Kesehatan Masyarakat
☉
