Ditemukan 40287 dokumen yang sesuai dengan query :: Simpan CSV
As a place of work, hospitals have high dangers and risks, especially related to occupational safety and health. Therefore, in order to protect human resources, assets, and hospital facilities, a comprehensive system is needed in managing OSH implementation in hospitals. To ensure the OSH system is implemented properly, special assessment instrumens are needed to be able to describe the extent to which the OSH system has been implemented in hospitals. In order to develop an appropriate assessment instrumen for hospital patients, this study conducts an analysis related to hospital SMK3 assessment elements, through a review of existing research results. Based on searches conducted on the Science Direct, Jstor, SpringerLink, ProQuest, Sage Publication, Oxford Journal, Google Scholar, and Garuda Dikti databases, 486,132 journals were obtained. Through the evaluation of inclusion and exclusion tests, 18 literatures were selected. From the 18 literatures, it was found that important elements needed in assessing hospital SMK3 implementation are: OSH implementation, building and maintaining commitments, OHS risk management, and developing the skills and abilities of hospital staff.
The development of the growing construction have a high risk of work accidents.Occupational health and safety management systems as a means of preventing theoccurrence of accidents and other damage caused. The purpose of this study isknowing the implementation of SMK3 through analysis OHSAS 18001 externalaudit results compared with PP RI No. 50/2012 on project development BogorValley Residence apartments and hotels. Design study is a descriptive analytic.Method of data acquisition through interviews with three informants andsecondary data. The results showed that the level of adoption research SMK3 inPT X by PP RI No. 50 of 2012 as much as 96.9%, which is an extension formshould be preserved or enhanced. While the causes of the audit findings are notthe tools of measurement, not the SOP chemical handling, improper planningprogram, not the SOP renew documents, and lack of supervision and inspectionof hazardous areas. On the whole causes of the findings are the lack of supportand active participation from top management and project management for K3program.Keywords : SMK3, Audit OHSAS 18001, PP RI no.50/2012
Hasil penelitian menunjukkan bahwa pada pelaksanaan audit internal sistem manajemen keselamatan dan kesehatan kerja di PT belum berjalan dengan baik dan maksimal. Poin utama dari lemahnya pelaksanaan audit internal tersebut adalah implementasi, pemantauan, tinjauan ulang dan perbaikan pada sistem manajemen audit yang dilaksanakan. Perbaikan pada tahap perencanaan dan implementasi menunjukkan poin utama yang harus segera diperbaiki guna meningkatkan kualitas sistem manajemen audit dan bisa mengevaluasi sistem manajemen yang berlangsung di perusahaan dengan lebih baik.
